Babst Calland: Utica and Marcellus Formations to Provide Gas to TransCanada’s ANR Pipeline

By Leah R. LaFramboise

TransCanada Corporation’s ANR Pipeline system has secured nearly 2.0 billion cubic feet per day of natural gas transportation commitments for the movement of oil and gas produced from the Utica and Marcellus formations through its Southeast Main Line. These contracts involve transporting natural gas to points both north and south within ANR’s system, as well as increasing their flow capability to the Gulf Coast. ANR is one of the few existing pipeline systems with access to both the Upper Midwest and the Gulf Coast, and they are exploring further opportunities to transport gas produced from the Utica Shale to these areas.

Copyright 2014 • Babst, Calland, Clements and Zomnir, P.C. • Two Gateway Center, Pittsburgh, PA 15222 • 412-394-5400 • Administrative Watch is privately distributed by Babst, Calland, Clements and Zomnir, P.C., for the general information of its clients, friends and readers. It is not designed to be, nor should it be considered or used as, the sole source of analyzing and resolving legal problems. If you have, or think you may have, a legal problem or issue relating to any of the matters discussed in the Administrative Watch, consult legal counsel.

For more information about LexisNexis products and solutions, connect with us through our corporate site.