Description
Using actual verbiage, we will demonstrate, among other things:
• How an owner can use the architect to control the prospective cost of a project
• The insurance requirements that an architect should meet
• Why a construction manager should have input into the design process and what the limitation of liability for design should be
• The differing points of view concerning delays and delay damages
• How the parties view the risk of consequential damages
• Varying ways that payment for the work can be addressed